REC Schedule 2 – Transition - REC Documents
REC Schedule 2 – Transition
See also: REC Schedules
The Transition Schedule sets out the obligations for users to cooperate with the design, build, test and implementation of systems relating to the Central Switching Service and defines the requirements for both the overall and Individual Programme Plans.
You can access this schedule with a Portal account on the Energy Market Architecture Repository (EMAR).
Contents |
Transitional Provisions
The transitional provisions described in this Schedule apply until Steady State Commencement Date has been met; this is the date and time that the Authority deems that all exit criteria have been met and the handover to steady state governance should take place.
Testing Phases Activities and Roles
The role of Programme Co-ordinator and System Integrator are described and the key activities for the Testing Phase under the E2E Testing Phases are outlined including Pre-Intregration Testing, Systems Integration Testing, User Integration Testing, Data Migration and Transition Testing, Operational Testing and Live Proving.
Data Migration
Data Migration and the requirement to comply with the E2E Data Migration Plan and the CSS Data Migration Plan are detailed in this Schedule as is the management of In Flight Switches.
Post Go Live
Defect Management and the Post Go-Live Date Requirements are also defined.
Consolidation
A number of consolidated processes and procedures are also referenced in the Transition Schedule relating to Energy Theft Consolidation, DCUSA, BSC, Retail Code Consolidation covering SPAA and MRA and their respective transition schedules, Green Deal, SMICoP, and Codes of Practice for Meter Asset Managers, Approved Meter Installers and Meter Operators (Formerly known as MAMCoP, AMICoP and MOCoPA).